Advanced Search
SONG Wen. Analysis and evaluation on the influence of road span to the existed underground structure[J]. Forestry Construction, 2021, 39(3): 81-84.
Citation: SONG Wen. Analysis and evaluation on the influence of road span to the existed underground structure[J]. Forestry Construction, 2021, 39(3): 81-84.

Analysis and evaluation on the influence of road span to the existed underground structure

More Information
  • Received Date: April 24, 2021
  • Available Online: January 18, 2024
  • When a new road crosses an existed underground building structure, it is necessary to carry out engineering technical evaluation of the crossing project according to the requirements of the code. Combined with the case, from the design, construction and operation process of the new road spanning the existed underground building structure, the paper analyzes the most unfavorable situation according to different working conditions, analyzes and evaluates the underground structure, so as to provide reference for other similar projects.
  • [1]
    住房与城乡建设部.GB50010-2010混凝土结构设计规范[S].北京:中国建筑工业出版社,2010.
    [2]
    交通运输部.JTG 3362-2018公路钢筋混凝土及预应力混凝土桥涵设计规范[S].北京.人民交通出版社,2018.
    [3]
    云南省交通运输厅云南省质量技术监督局.DB53/T2020-2017.涉路项目工程技术评价规范[S].北京:人民交通出版社,2020.

Catalog

    Article views PDF downloads Cited by()

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return